patchingbannerdry.gif (18695 bytes)
1 2 3 4 5 6 7 8 9

patching-18.jpg (30423 bytes)

For best results, be sure patch has cured a minimum of five (5) days before final washdown with a masonry cleaner.

Some finishes which contain coloring pigments may require a mild acid wash during cleaning in order to obtain a better color match.

Over a period of months, curing, weathering and ultraviolet bleaching will have a tendency to further blend the finished color of the repair.

Back